Cable routing Auerbruecke
Between the power station Auerbruecke and Nonnenmuehlsteg all supply lines had to be rearranged. The infrastructure project was necessary and completed simultaneously to the construction of the upstream fish migration necessary and realized. All work was carried out while maintaining the utility.
We were assigned with all engineering services ( turn-key engineering services). Special challenges were the traffic management which had to be coordinated at the same time with bridge rehabilitations of the city Pforzheim. Missing storage space made the sitting of the crane on the piers of the hydropower station Auerbruecke necessary.