Culvert river Enz Broetzingen-Enzberg In the district of Broetzingen-Enzberg in Pforzheim, the riverbed of the Enz was crossed for an improved infrastructure with numerous supply lines. Dr. Hutarew & Partner took over the planning and implementation. A particular challenge was the crossing Broetzinger bridge and the drainage in the crossing area. We were commissioned with the planning [...]
Cable routing Auerbruecke
hutarew@hutarew.com2021-05-06T12:16:38+00:00Cable routing Auerbruecke Between the power station Auerbruecke and Nonnenmuehlsteg all supply lines had to be rearranged. The infrastructure project was necessary and completed simultaneously to the construction of the upstream fish migration necessary and realized. All work was carried out while maintaining the utility. [...]
Nuclear power plant Rheinschanzinsel
hutarew@hutarew.com2021-05-10T09:08:13+00:00Drainage of nuclear power compound Rheinschanzinsel As part of the integrated Rhine program, Dr. Hutarew & Partner prepared the design for approval for the complete retention basin Rheinschanzinsel (polder RSI) near Philippsburg. The approval of the overall measures was subsequently granted. In the next step the execution phase of the subprojects followed, including the flood protection of [...]